<- Back to Projects

VEX High Stakes CAD Breakdown

Mechanical design project for the VEX High Stakes season, built around a two-bar arm, conveyor scoring path, intake packaging, mobile goal control, and autonomous ring-grabber mechanisms. The design work balanced reach, handoff timing, cycle speed, driver-control demands, autonomous reliability, and match durability.

Role

Mechanical Design / Team Captain

Timeline

August 2024 - May 2025

Location

Flushing, New York

Tools

VEX V5 / Mechanism Design / Prototyping / CAD

Initializing viewer

Click part to select · Drag to orbit · Scroll to zoom

Full assembly

VEX Robotics High Stakes Competition Robot

Full CAD assembly of the VEX High Stakes competition robot, composed from the drivetrain, support frame, conveyor/intake, two-bar ring mechanism, mobile goal clamp, and autonomous front ring-grabber mechanisms.

Tools

VEX V5CAD AssemblyMechanical DesignCompetition Robotics

Design notes

Use this full view to understand how the drive base, structure, scoring mechanisms, mobile goal control, and autonomous mechanisms fit together into one competition-ready robot.

Project summary

  • Contributed to design and iteration of a two-bar arm and conveyor scoring system, refining arm geometry, conveyor routing, intake packaging, and motion paths to improve scoring consistency.
  • The design work balanced mechanism reach, intake handoff, driver-control requirements, cycle speed, autonomous performance, driver-control performance, and match reliability.
  • Led design reviews, delegation, and competition preparation as team captain for a team that won the New York State Championship, ranked 12th at VEX Worlds, and received New York State Assembly recognition.